Company News

ECRL Project Achieves the Goal of “Half of the Time, Half...

0
2023 is the "tough year for civil construction" of the East Coast Rail Link (ECRL) project constructed by CHEC, and the project has ushered in the peak of civil construction. Centering on the annual plan of the project and the goal of the labor competition in the first half of the year, Divisions I-VII have comprehensively overfulfilled the goal of "Half of the Time, Half of the Tasks ", which added a bright color to the progress of the project.

What We Do

Southern Transport Development Project Package 1 of Sri Lanka

0
Southern Transport Development is the first highway project as required by Sri Lanka’s City Overall Development Strategy. It is located southwest of Sri Lanka...

Projects

Sonaref Refinery Project Dredging for Marine Facilities, Angola

0
Dredging in a trapezoid area about 2000m long and 300m wide at the maximum width location, excavating the specified area a 15 meter deep...

STAY CONNECTED

654FansLike
174SubscribersSubscribe

Design, Construction and Completion Of The Second Penang Bridge, Package 1- Main Navigation Span...

0
The Proposed Second Penang Bridge (P2B) is Malaysia's largest civil works for the past 20 years. China Harbour is to Design, Construction and Completion of...

Shanghai Donghai Bridge

0
Donghai Bridge stretches 32.5km and is the only road-link to the main land for Yanshan Deep Water Port. The standard width of the bridge...

Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

0
Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

Damma Oil Terminal Project, Sudan

Design and construction of -14.6 m oil terminal for 50000 DWT in the structure of boring pile pier foundation, construction of approach embankment with...
Code of Practice

Code of Practice

Chief Executives’ and Board of Directors’ Workplace Safety and Health (WSH) Duties